Daylight Savings Time 2015 
A. Server/Workstation - Power Down Routine.
End all jobs on the floor and stop floor production.
Power down the following machines.
  1. Insite (If exists)
  2. Data Pump (If exists)
  3. DC/MSM - Workstations
  4. RSM    (If exists)
  5. Web/App server   
  6. DB server
Note: if Web/App & DB are in one box bring down the one box server.   
  

B. Server - Power Up Routine.
Please power up the following machines.
***NOTE: Be sure to double - check the DC Server to make sure it’s time is set correctly 
  1. Bring up the DFWorks Data Base server (Check the time and Correct as needed)
  2. Bring up the DFWorks Web/App server (Check the time on the server).      
      
C. Workstation Power Up.
Please power up the following machines.
1. Insite (If exists)
2. Data Pump (If exists)
3. RSM  (If exists)
4. DC/MSM Workstations one at a time and make sure when the batch file runs it sets the "correct time" on workstation.   
  
Once all the times are correctly set each Workstation can begin processing mail normally.   