Creating a date correction job on the SendPro MailCenter and SendPro P

Create a date correction job if you need to update the date on your envelopes.
Products affected: SendPro® MailCenter 1000, SendPro® MailCenter 2000, SendPro® MailCenter 3000, SendPro® P1000, SendPro® P1500, SendPro® P2000, SendPro® P3000

Create a date correction job if you need to update the date on your envelopes.

Watch this video or follow the instructions below to learn how to print a date correction.

  1. Select Run Mail from the Home screen.
  2. Select Options.
  3. Select Create a new job.
  4. Select Date correction and then select OK.
    Note: The weighing method does not appear in a date correction job. Sealing mode is set to off.
    Date correction job
  5. (Optional) Select an account.
  6. (Optional) Change the format of the date.
  7. If you are printing a tape, select Tape.
  8. If you are printing on an envelope and if the envelope is sealed, change the sealing method to sealer off.
    1. Turn the envelope around 180 degrees so that the postage is in the lower left corner. Place the envelope on the feed deck with the flap facing down.
    2. Select Start.
  9. To save the job, select Save As at the top of the screen.
  10. Enter the new job name and then select OK.

UPDATED: July 17, 2026