Creating a date correction job on the SendPro MailCenter and SendPro P
Create a date correction job if you need to update the date on your envelopes.
Products affected: SendPro® MailCenter 1000, SendPro® MailCenter 2000, SendPro® MailCenter 3000, SendPro® P1000, SendPro® P1500, SendPro® P2000, SendPro® P3000
Create a date correction job if you need to update the date on your envelopes.
Watch this video or follow the instructions below to learn how to print a date correction.
- Select Run Mail from the Home screen.
- Select Options.
- Select Create a new job.
- Select Date correction and then select OK.
Note: The weighing method does not appear in a date correction job. Sealing mode is set to off. - (Optional) Select an account.
- (Optional) Change the format of the date.
- If you are printing a tape, select Tape.
- If you are printing on an envelope and if the envelope is sealed, change the sealing method to sealer off.
- Turn the envelope around 180 degrees so that the postage is in the lower left corner. Place the envelope on the feed deck with the flap facing down.
- Select Start.
- To save the job, select Save As at the top of the screen.
- Enter the new job name and then select OK.
UPDATED: July 17, 2026