Issue

Your meter displays the message "Connection Due" or "Connection Required" or "Connection Required by Post" and does not run mail.

Cause

USPS® regulations require that your meter get inspected periodically. This inspection occurs automatically when you connect your meter to the Pitney Bowes Data Center to refill postage or perform a balance inquiry. 

Resolution

Follow these steps to connect the meter to the Pitney Bowes Data Center to clear the message:
  1. Make sure that your meter is connected to access the Pitney Bowes Data Center using:
    • a SmartLink device
    • PC Meter Connect
    • a Communication Device
    • a dial-up phone connection
  2. Select Connect Now or have your meter check your PB Postage (PBP) balance.
Important: It is unnecessary for you to add funds to your meter to clear this message.
  1. Follow the prompts on your screen to complete any pending downloads.
Use the Contact Us options below, if you need further assistance.

Related articles

  • If your meter cannot connect to the Pitney Bowes Data Center, see Resolving meter connection issues for your meter model.
  • See the Install Guide that came with your meter for setup instructions. Find install guides on the support page for your meter model.

UPDATED: August 14, 2021

Contact Us
Live Chat
Available • Closes at 8pm ET
Sales team hours are 8am-6pm ET
Live Chat
Live Chat is currently unavailable.
Chat is available Mon-Fri, 8am-8pm ET
Create a case
Submit support requests (Sign in required)